![]() Moving floor beam steels after delivery. | ![]() Floor beams wrapped in a wire mesh and trenches filled with concrete. | ![]() Trenches fully filled. | ![]() Removing turf and top soil and filling up the hole after installing soak-away cages. | ![]() |
---|---|---|---|---|
![]() | ![]() Shovelling ballast into the mixer. | ![]() The 6 tons of ballast. | ![]() Wet concrete. | ![]() Start of timber-frame construction for the Annex |
![]() Battening external walls around the window and door openings for air flow and fixing further insulation. | ![]() | ![]() Fitting the kitchen in the Annex | ![]() Connecting the waste pipe to the sewers. |